Monday, April 25, 2011

Caves

We visited the 3 caves:
a. Jewel Cave (dried cave)
b. Mammoth Cave (dried)
c. Lake Cave (water still running through...)

Temperature: 15°C (chilling and dark)


This is what normally you could found in a cave:
- Straws grow in places where water leaches slowly through cracks in rock, such as on the roofs of caves (look alike spaghetti)

- Stalactites is a type of speleothem (secondary mineral) that hangs from the ceiling of limestone caves.

- Stalagmite is a type of speleothem that rises from the floor of a limestone cave due to the dripping of mineralized solutions and the deposition of calcium carbonate.

Dripstone (Column): Formation of  Stalagmite & Stalactites



P/S: For more photos, click here

Sunday, April 24, 2011

Short Trip- Part II

We visited our first cave on Saturday morning at 9.30am...

Name: Jewel Cave
Location: Approximately 38 kilometers south of Margaret River and 12 kilometers north of Augusta
Check out the website for more information...

Short Trip- Part I

On 22 Apr 2011 (Friday), we departed at 6am from our rented house and here's the summary schedule of our trip... 

0900: Arrived at Busselton Jetty
- Photo taking
- 2km walk to the end of jetty
- Visited Busselton Underwater Observatory
- 2km return with the train
1200: Arrived at Margaret River
- Visited the information center, bought two-ultimate pass at AUD60/pac 
(for 4 places- 3 Caves & 1 Cape)
- Lunch at Dome
1400: Heading to Brilea Cottage B&B
1530: Bought some frozen foods from IGA
1600: Arrived at Cape Leeuwin Lighthouse (with tour guide)
- Photo taking
- Heading to the lighthouse step by step
1700: Back to Brilea Cottage

and I slept at 1900... 
Can you image how tired I was?


Photos available:

Happy Holiday

We're finally back to Perth at 4.30pm!
-cming


P/S: Will upload the pic once I had them filtered!

Wednesday, April 20, 2011

Add-on..

Neighbor's and ours...
(later on, we'll have fencing in between and on the other side)
  













P/S: There will be another 3 neighbors joining us soon! After all, the construction will resume on next Wed as we'll be having a 5-days off (Fri~ Tues). As for both us, we'll heading to Margaret River

Contruction continues II...

My house was covered with roof now...




Internally...



Electrical job is going on as well...




Installing downpipes too...

Wednesday, April 13, 2011

Construction continues....

On 12 Apr 2011: Still working on roof



On 13 Apr 2011: Gutter Installed

Monday, April 11, 2011

WIP- Part VII

Construction continues as usual.....
Now, we're a step ahead- Roof Carpentering!

As you know, we're in Autumn (Mar- May) and most of the time, we'll get rain drops. If it kept raining all the time, the construction might be delayed and we can't move in on time. Therefore, we just hope that they could finish up this within a week or two. After all, they just need to concentrate internally e.g. wiring, floor tiling, door/window/cabinet installation and so on...

Front view

Frame on left: To my room1
Frame on right: From garage to the house

Living area

Side View (Laundry Area)

Another Side View

Sunday, April 10, 2011

My first Sat & Sun

Finally, I had my off on Sat and Sun...

Basically on Sat, that's my schedule:
09.00am~Visited Tyre shop for car servicing/ balancing
                Windows Shopping/ Breakfast at Centro Maddington
10.30am~Window shopping at Amardale shopping centre
12.30pm~Bought computer table and chair at Homeart, Maddington
13.00pm~Back to HSH/ Installation/Watching movies/Sleeping
19.30pm~Dinner
20.45pm~Watching TVB drama
22.30pm~Zzzz


During our shopping atMaddington, we found something that caught our eyes-Balloon Flight. We decided to go for a Balloon Flight in December (it costs a fortunate (approx. AUD300/pax)- but I'm sure it's worth a penny).It took about an hour or two from Perth.  Anyone who is interested could check out from Avon Valley website.


However, I'm staying at home on Sun- cooking and cleaning.

 
What about you?


P/S: This is the last shot for bricklayer. They should be moving to the next phrase next week~Roof Carpentering!
The garage is finally sorted out
The timber in front is for roof-installation

The two pillars in Alfresco

Tuesday, April 5, 2011

Second Day in Complaint Team

Since Monday, I have a total of 17 cases on hand!
Today, I finally sorted 2 of them and assigning 3 cases to Public Liability (never heard of this at all)
Besides, I have 3 cases awaiting technician reply (appointment scheduled).
I will be calling the customer to follow up as the rest of the case

It's absolutely a HARD and TIRING day for me
Anyhow, I'm still enjoying it because I had made the choice and can't regret about it
;)

I'm making a BIG progress
because I kept asking question (I have no direction at all)
Hope that they won't be thinking I'm a problematic person!

Monday, April 4, 2011

WIP- Part VI

At last, they had the second room and garage (partially) completed and this is the garage (one of the door to the house and the other to laundry)

Honestly, I can't wait to move in...Approx. 5 months from now!;)

I have to go to bed now...
Zzzzz
zzzz
zzz
zz
z

Sunday, April 3, 2011

COMPLAINT...COMPLAINT...COMPLAINT

As you heard, I'll be moving to Complaint team for a month (max of 3 months). We won't be taking calls . More likely, we're doing BOH (Back of House)! As a Front of House consultant, we need to achieve AHT (average hold time), FCR (first call resolution) and etc..This is the KPI (key performance indicator) whereabouts we're not requiring to achieve it at the time being. How good is it right? Before that, I'm really stressed (taking months and months to brush up myself). Nowadays, taking calls is a piece of cake to me (exaggerating?)

There is always PRO and CONS- depending on how you gonna take it !  FYI, there were 5 cases  been assigned to my system already. Basically, I had read through and summarize as:
Case 1:  Telstra van hit on my bin that cost AUD150.00
Case 2:  Telstra employee had stepped on my plants and wanted compensation. AUD10/plant
Case 3:  Telstra employee had broken my roof tiles and need to be repaired ASAP. 
Case 4:  My service is not working since XXX. I'm a business customer.......
Case 5:  Similar to Case 1

Frankly speaking, I have no idea what should I do! Luckily, we are still able to contact NSW's team to assist us....Tomorrow, I will be very, very, very BUSY ;) Besides that, we been required to email the status of the case to our team manager before lunch/knocking off... 

I will make my utmost effort....That's what I'm gonna say!
加油!加油!加油...

Saturday, April 2, 2011

WIP- Part V

Yesterday, I could see the structure of my entire house already! My room, kitchen and etc....I presumed that by early next week we'll be heading to the next phase- Roof Carpenter (installing the roof).  The following photos was taken by hubby as I was working late on 31 Mar 2011. I supposed to include the one taken on 1 Apr, unfortunately hubby haven't upload the photos yet! (Only 2 photos from 1 Apr)

Front View on 31 Mar 2011

Front view on 1 Apr 2011

Internal view

Kitchen area- that's the 2 awning windows

Laundry area, where you had your washing machine and dryer here 
Metal frame (that will be the linen- storage purposed)

Side View on 1 Apr

Friday, April 1, 2011

New Role. Exciting. Challenging.

From next Monday onward, I'm no longer taking T-BOX and T-HUB calls...
and temporarily, I'll be moving to COMPLAINTS team to manage the customers' complaint

Currently, there are heaps of complaint that had not been action, Perth will be assisting New South Wales (NSW), handling the complaints. Basically, we'll be assigned 10 cases/day. After-all, we'll give a ring to customer, acknowledging them I'll be the customer's case manager. On the other hand, we'll need to provide  them a concrete solution (whereabouts customer is happy about it).

For me, it will definitely a challenging and exciting job as there won't be any Right Now Answer for us anymore. e.g Customer complained that their bill is over-charged.
I need to call Billing to check out the reason  why their bill is being over-charged...If I found out that fault lies from our end here, I'll need to re-credit that amount to customer.
Before that,  I used to warm/cold transfer the call to Billing for further assistance. Furthermore, I don't have the access to credit the amount to customer

In the meantime, I will then be working on a fixed schedule (7am-2.30pm Mon-Fri) 


Wish me ALL the BEST ;)


Ta

Wednesday, March 30, 2011

WIP- Part IV

Today, we finally met our next door neighbor ~ Alison and Laura (Laura told me Alison is her girlfriend). I was guessing, they might be couple! Anyhow, we had met our neighbor....


The main reason of this blog is to continuing showing you the progress of my house
On 28 Mar 2011 Internal bricklayer (red one) just started
Entrance door

Another layer of the brick


30 Mar 2011 Internal bricklayer (red one) was partially completed (waiting for the rooms)

Wednesday, March 23, 2011

WIP- Part III

Stage 3: Bricklayer
(The pic was taken on 22 Mar 2011)

Black frame(from left to right): Room 2, Toilet, Bathroom 
White frame: Door from garage to laundry

 










Black frame: Sliding door to Alfresco

 View from Alfresco 

Sunday, March 20, 2011

???

Listening to Malaysia Mix FM 
"Cold Play- Viva La Vida" is on-air now at 9.46 on this beautiful Sunday 20 Mar 2011

Housemates (and definitely my sis) are still sleeping...
Husband is on the way for badminton match....
Mum must be eating her breakfast or lying on the bed enjoying her series of novel...
Fellow colleagues are taking calls
Me? Blogging (of course!)

What about you? Cooking? Washing? Babies?...
No matter how is it, certainly it must be an enjoying day to YOU n ME!


---------@@@@@----------

I could track the progress of the construction of my new house:
(one in blue=completed)

---------@@@@@----------

Anything happy thing to share- I'm going on a short break again during Easter! We're heading to Margaret River (about 3hours drive from Perth)- Another B&B (Bed & Breakfast) at AUD90/day at Brilea cottage(family owned). Supposedly, the min stay of every hotel, resort,chalet is 3-days during peak holiday (Easter and Xmas) . Luckily, the owner allow us for just 2-days (as I told you-I'm a contract (no leave entitled). Even just 3-days, I have to apply for leave. Anyhow, that's not important at all as long as the journey benefited me! Hahaha....


Friday, March 11, 2011

Friday Morning

It's now 6.43am and I'm not working!
The weather is about 28-29 degree- Cool and nice outside!

Today, I'll spend my time....
- Continuing my TVB series of course (Anyway, I've finished 'The Little Nyonya')
- 煲凉茶! (WIP)
- Waiting for husband to finish work at 1pm
- Visiting the construction site
- Accompanying husband for a hair cut
- Grocery shopping

It's now 7.27am....and I'm knocking off now..

Before I left, something to share you after my working hour at 8.15pm. Guess what? A nut pee in front of me and others in the train some-more! I could describe in just a word- GROSS! GOD, what happen to the world? (Luckily, he didn't show his X)

Wednesday, March 9, 2011

Hi Hi

Just drop by to say Hi before going to work!
Ya, I'm starting at 4.45~9.45 (5 hours shift)
That's the reason I'm still here, blogging! :)
(FYI, I'm in the office, taking calls now)

Recently, I'm watching a Singapore drama- The Little Nyonya '小娘惹'. This drama reflected the life of  a nyonya with tears and laughter..I'm just half way through.. Still lots more to go. Perhaps, let me briefly introduce you the drama

Title:  The Little Nyonya '小娘惹'
Episode: 34
Staring: Jeanette Aw 欧萱, Pierre P'ng 方展发, Xiang Yun 向云, Felicia Chin 陈靓萱
Synopsis:  A life of a maid in Huang family, becoming a second mistress and 'torturing' life continued....


Anyone watching?

Thursday, March 3, 2011

WIP- Part II

I have new neighbor!

FYI, my next-door neighbor started their construction a week earlier than us. Unfortunately, we still have no chance meeting the owner yet (my neighbor). We used to visit the site when we're free (is about 5 -8mins from our current location). We did notice that there are a few more construction to be going on, however, till now still they haven't start yet !(Awaiting building license,perhaps?) At this stage, only the two of us commencing the construction...

I received a letter from our builder that we need to attend 4 meetings during the construction:
- Brickwork Meeting
- Ceramic Tiler Meeting
- First Practical Completion Inspection
- Final Completion Inspection 
 
Hopefully, we could move in before summer. Normally, it took about 6-months to complete the construction! From the estimation time length, it should be in August 2011. We could take a month for preparation (e.g. painting, flower/ grass planting and etc) as August is "Ghost Festival" (July in Chinese calendar). Anyway, we will see how it goes. Perhaps, it might complete sooner. Who KNOWS?

In the meantime, of course, I will definitely calculating/budgeting for the new house (surveying for furniture and electrical appliance) I did show this to Angie. Maybe I should share it with you too!


Before that, I have been visiting shops (IKEA and other furniture shops) but can't really find the ONE. Therefore, I decided to check out from ebay website and finally I saw this! The problem is now I have no place to keep it (currently, I'm just renting a room!) I wish they could keep that in their depot until my house is ready. Unfortunately, they are only able to keep that for a month. I'm thinking of renting a small container- still awaiting their reply :)

What do you think of?